Services Recent Work Reviews Areas Advice Contact Call us today
Home·Advice·Planning a Single Storey Extension in Borehamwood
Advice · Borehamwood & Hertfordshire

Planning a Single Storey Extension in Borehamwood

A single storey extension is one of the most common ways Borehamwood and Elstree homeowners get a bigger kitchen or an open-plan living space without moving house. The build itself is fairly simple. The planning, the paperwork and the decisions you make early on are what decide whether it goes smoothly, so this guide covers what to sort out before the builders arrive.

Published 13 November 2026

Do you need planning permission?

Many single storey rear extensions can go ahead under permitted development, so you don't need a full planning application. The basic limits are a depth of up to 3 metres from the original rear wall on a semi-detached or terraced house, or 4 metres on a detached house, and a height of no more than 4 metres. If any part sits within 2 metres of a boundary, the eaves can't be higher than 3 metres. Through the prior approval scheme, which Hertsmere Borough Council handles for Borehamwood and Elstree, you can go further: up to 6 metres on a semi or terrace and 8 metres on a detached house. Your neighbours are told and get the chance to object.

Permitted development rights can be removed or limited. That happens in conservation areas, on some newer estates where the original permission took them away, and on houses that have already been extended. Side extensions and wrap-arounds usually need full planning permission. If you aren't sure, a Lawful Development Certificate from the council gives you written confirmation, and it's useful to have when you sell.

Building regulations, party walls and drains

Planning and building regulations are two separate things. Even if your extension is permitted development, it still needs building control sign-off for structure, foundations, insulation, drainage, ventilation and fire safety. Big glazed areas and roof lanterns have to be checked against the energy efficiency rules, and that can affect how much glass you're allowed without extra insulation somewhere else.

Two other things often catch people out:

Designing the space you actually want

Most single storey extensions here are kitchen-diners or family rooms that open into the existing house. Taking out the original back wall nearly always means installing a steel beam, sometimes several, so you'll need a structural engineer's calculations as part of the design. Think about light as well. A deep extension can leave the middle of the house dark, and rooflights, a roof lantern or a run of bifold or sliding doors make a real difference.

Decide early whether you want a flat roof or a pitched roof with rooflights, where the kitchen units and island will go, and whether you want underfloor heating. Changing these things once the shell is up costs much more than getting them right on paper.

Realistic costs and timings

Costs depend heavily on size, ground conditions, the amount of steelwork and glazing, and the finish you choose. As a rough guide, a straightforward shell with a standard finish in this area often works out at something like £2,000 to £3,000 per square metre. Large glazing, structural complexity or a high-spec kitchen can push that well past £3,500. Get a fixed, itemised quote and keep a contingency of around 10 to 15 percent.

Allow time for the stages before the build. Design, drawings and structural calculations usually take a few weeks. Prior approval takes up to eight weeks, and a full planning application often takes eight weeks or more. On site, a typical single storey extension takes roughly 10 to 16 weeks from groundworks to handover, depending on size and on how much finishing work is included.

Frequently asked

Common questions.

Can I build a single storey extension in Borehamwood without planning permission?

Often yes, if the house still has its permitted development rights and the extension stays within the size and height limits. A Lawful Development Certificate from Hertsmere Borough Council confirms it in writing.

Do I need to tell my neighbours about my extension?

If the work falls under the Party Wall Act, you must serve formal notice, usually at least two months before work starts. It's also worth talking to neighbours informally early on, especially if you're applying for prior approval, because they will be consulted.

How long does a single storey extension take to build?

Most take around 10 to 16 weeks on site, but planning, design and party wall agreements can add two to four months beforehand. Deep foundations or late design changes can stretch the build itself.

Related

More on what we do.

Got a project in mind?

Tell Jimmy what you have in mind and get an honest quote, no pressure. We cover Borehamwood and the surrounding areas.

Get in touch

Tell us about your project.

Tell us about your project and we will get back to you the same day with a clear, no-obligation quote.

Call or text
Email
email us
Based in
Borehamwood, Hertfordshire
Response time
Usually same day

We'll get back to you the same day, usually within a couple of hours.